Profile: JV Imaging Solutions Inc. specializes in image processing equipment for flexographic plates, thermal processing equipment and solvent recovery units. The RI 20 recovery unit runs 6 gallons at a time and requires 2 batches a day to run a 55 gallon drum per week. The average recycle time is 3-5 hours from start to finish. The RI 80 recycles a minimum of two 55 gallon drums per week and runs 20 gallons at a time.
7 Products/Services (Click for related suppliers)
| |||||
• | Flexographic Printing Plates | • | Image Processing | • | Image Processing Equipment |
• | Image Processing Systems | • | Solvent Recovery Systems | • | Thermal Processing |
• | Thermal Processing Equipment |